返回

高中英语

首页
  • 阅读理解
    In today’s throw away society, dealing with the city’s growing mountain of waste is an inereasing challenge for the city countil(市议会)。
    Recently. Edinburgh is faced with the problem of dssposing of(处理)about250,000
    Million tons of waster a year . Despite different ways to dispose of much of it in a green manner---largely through encouraging tecycling---its aging facilities such as the Powderhall landfill do not have the ability to deal with it.
    The European Union(EU) has issued a new policy, regulating how such mountains of waster are to hr disposed of. The five councils (Edinburgh. East Lothian. West Lothian. Midlethian and Borders) face fine around $18million a year from 2013 it they don’t inerease recycling levels and rely less on landfill. With this in mind, the coumlls got together with the idea of building a lage incinerator plant (垃圾焚烧厂)to burn half of the waste produced in their districts. But the plan fell apart after the change of target levels by a new UK government waste policy which required that no more than 25% of the city’s waste should be disposed of in this way by 2025.
    After the plan was abandoned, a private company which already transported millions of tons of the city’s wast by train to a landfill site near Dunbar, offered an alternative soution when it suggested opening a huge waste site near Portobello.
    Since Powderhall is supposed to close in 2015, it seemed necessary for the members of the Edinburgh Council to accept the suggestion. But soon they turned it down—after 700 local objections reached them—because it would have meant hundreds of lorries a day making loud noise through heavily populated areas.
    That still leaves eth council with a problem. By 2013,only50%of 1995 levels of waste will benllewed to be sent to landfill. Even if recveling large are met, there will still be a large amount of rubbish to be burnt up. Due build an Edinburgh and Midlothian councils have now decided to work together to build an ineinerator plant as time to find a solution is fast running out.
    小题1:The main way of handling waste in a green manmer in Edinburgh is       .
    A.recyelingB.restoringC.buryingD.burning
    小题2:The five councils worked out a plan to build an incinerator plant to       .
    A.reduce the roast of burying waste
    B.meets the EU requirements
    C.speed up waste recycling
    D.tempter landfill sites
    小题3:The city council of Edinburgh rejected the suggestion to open a huge landfill site near Portobello because     .
    A.a name from a private company
    B.the comelier was not interested in it
    C.it was not supports by EU
    D.the local poodle was waist it
    小题4:What is the final dream an Edinburgh and Midlothian Country?
    A.To open a new landfill nearby
    B.To close the powder hall landfill in 2015
    C.To set up a plan for burning waste
    D.To persuade people to deduce their waste.

    本题信息:英语阅读理解难度一般 来源:未知
  • 本题答案
    查看答案
  • 答案解析
    查看解析
本试题 “In today’s throw away society, dealing with the city’s growing mountain of waste is an inereasing challenge for the city countil(市议会)。Recently....” 主要考查您对

社会现象类阅读

等考点的理解。关于这些考点您可以点击下面的选项卡查看详细档案。
  • 社会现象类阅读

社会现象类阅读概念:

这类文章通过写人记事来揭示文章的主题,显示其社会意义,一般采用顺序或倒叙来叙述。题目经常是一些细节问题。考查的方面可以是原因和其中引发的思考。


社会现象类阅读解题技巧:

这类文章通过写人记事来揭示文章的主题,显示其社会意义,一般采用顺序或倒叙来叙述。题目经常是一些细节问题。考查的方面可以是原因和其中引发的思考。阅读这类文章要理清思路。
1、浏览试题,明确要求。
      在阅读文章前,最好先浏览一下文章后面的题干和选项。知道了问题后再去看文章,可使思路更敏捷,而且也便于阅读时留意文中出现的与选项有关的信息。   
2、通读全文,抓住主要内容。
      在不影响理解的前提下,尽可能地阅读以便在尽可能短的时间内理解文章或段落的内容。阅读时,如遇到不熟悉的单词、词组或一时看不懂的句子,不要停下来苦思冥想,继续读下去,通过上下文的词语和句子可能就理解了。   
3、抓住中心思想和段落大意。
      通读全文时,要特别注意主题句。每篇文章或每个段落都有与文章有关的句子,尤其是科技、政论性文章的主题句一般都在文章的开头或结尾,插在中间的很少。所以,文章的第一段或开头的第一、二个句子往往包含着文章的中心思想、作者的意图或全文的概述,因此要特别注意,彻底理解。   
4、有针对性地仔细阅读,找寻所需信息。
      在前面的基础上,可进行有针对性地阅读了。把与问题无关的内容一扫而过,而对于和问题有关的内容认真阅读,还可以用笔在下面做出记号。再把这些信息与问题的要求结合起来,逐条分析,综合判断,找出正确答案。   
5、进行合理的推理判断。
      对文章有了全面的了解之后,可以按照文章要求以及上下文之间的关系,做出推理判断。在进行推理判断的时候,需要综合考虑句型、语法、句子之间的逻辑关系、文化背景等方面的因素。   
6、认真复读,验证答案。
      要用全文的中心思想统帅各个题目,研究其内在联系和逻辑关系,并依次审核那些还未打上的题目,确保理解无误。